Medical Office Building, Kent
Drilled numerous borings and conducted liquefaction analyses to determine suitable soft-soil mitigation options as well as deep and shallow foundation design.
Over 400 aggregate piers were installed below the foundation and floor slabs to mitigate loose alluvial deposits.